encabezado_index_3
 
 
 
 
 
 
 
 
 

1. Resources and Efforts Optimization

By means of the implementation of the Responsible Care Management System (RCMS)system, introduced in April 2005, it is looked to optimize the required resources to implement and maintain the different management Systems, under the focus of an comprehensive management System adjusted to the characteristics of the organization, through 29 elements and the application of a Risk comprehensive management. The RCMS is certifiable and it allows the companies to advance, strengthen and maintain in a simultaneous way the elements of the ISO 14001 (Environmental Management), OHSAS 18001 (Safety and Occupational Health management ), ISO 9001 (Quality Insurance), INC 8000 (Social Responsibility System) norms and BASC.

 
 
 
Copyright © Responsabilidad Integral© Colombia 2005. Todos los derechos reservados
Desarrollado por Constructor Web
Resolución 800 x 600